![Teledyne ProEM Series System Manual Download Page 35](http://html1.mh-extra.com/html/teledyne/proem-series/proem-series_system-manual_1080561035.webp)
35
Chapter 4: System Setup
NOTE:
To minimize risk to users or to system equipment, turn the
system off before any cables are connected or
disconnected.
A ProEM camera system consists of four hardware components:
•
Camera;
•
Power supply;
•
GigE adapter card;
•
Cables: Ethernet, Power, MCX-to-BNC.
All of the components and cables required for your configuration should be included
with your shipment. Your ProEM system has been specially configured and calibrated to
match the camera options specified at the time of purchase. The CCD window and
coatings you ordered have been installed in your camera head.
Keep all the original packing materials so you can safely ship the ProEM system to
another location or return it for service if necessary. If you have any difficulty with any
step of the instructions, contact Teledyne Princeton Instruments Customer Support.
Refer to
on page 160 for complete information.
Hardware installation consists of:
•
Installing a dedicated GigE interface card.
•
Attaching a lens to a C-mount on the camera or to a C- to F-mount adapter.
•
Mounting the camera to a spectrograph (for spectroscopy applications).
•
Software installation depends on the application software you will be using to
run the system. Refer to the manual supplied with the software for information
about installing and setting it up.
4.1
Unpacking the System
During the unpacking, check the system components for possible signs of shipping
damage. If there are any, notify Teledyne Princeton Instruments and file a claim with the
carrier. If damage is not apparent but camera or controller specifications cannot be
achieved, internal damage may have occurred in shipment. Please save the original
packing materials so you can safely ship the camera system to another location or
return it to Teledyne Princeton Instruments for repairs if necessary.
Summary of Contents for ProEM Series
Page 1: ...www princetoninstruments com ProEM System Manual 4411 0126 Issue 3 September 26 2019 ...
Page 10: ...10 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 16: ...16 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 30: ...30 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 50: ...50 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 88: ...88 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 114: ...114 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 122: ...122 ProEM System Manual Issue 3 Figure 7 8 LightField Settings 4411 0126_0078 ...
Page 136: ...136 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 146: ...146 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 152: ...152 ProEM System Manual Issue 3 This page is intentionally blank ...
Page 161: ...This page is intentionally blank ...