Maintenance and Checking
MTD200 MPEG Test Decoder User Manual
6–5
6. Closing the instrument:
a. Put upper RF cover onto decoder board and screw it on.
b. Slide on top cover from the rear.
c.
Put instrument upside down.
d. Put lower RF cover onto decoder board and screw it on.
e.
Slide on bottom cover from the rear.
f.
Put back feet on rear panel and screw them on.
After this date and time have to be newly set.
g. Switch on instrument.
h. Set date and time in the SETUP menu.
S
D
E
A
T
T
U
E
P
+TI
-
M
1
E
4-
1
M
0
A
:
R
3
-
2
9
:
6
21
b
y
selecting DATE and TIME
'
a
selecting individual elements
ENT
entry mode
ESC
return to main menu
Checking
Upon power on, the instrument starts a BOOT procedure with a memory and
hardware check. If a fault is detected, a message is displayed on the LCD.
In the case of a total failure, send the instrument to your local service center.
Summary of Contents for MTD200
Page 1: ...User Manual MTD200 MPEG Test Decoder 070 9951 00...
Page 4: ......
Page 15: ......
Page 29: ...Introduction to Digital TV Transmission Technique 1 14 MTD200 MPEG Test Decoder User Manual...
Page 30: ......
Page 51: ......
Page 62: ......
Page 97: ......
Page 167: ...Remote Control 5 70 MTD200 MPEG Test Decoder User Manual...
Page 168: ......
Page 174: ...Maintenance and Checking 6 6 MTD200 MPEG Test Decoder User Manual...
Page 175: ......
Page 194: ......
Page 204: ...Glossary Glossary 10 MTD200 MPEG Test Decoder User Manual...
Page 205: ......
Page 209: ...Index Index 4 MTD200 MPEG Test Decoder User Manual...
Page 210: ......
Page 211: ......