Basic Test Procedures
3–10
CTS850 SDH/PDH Test Set User Manual
connecting the upstream and downstream signals to the RECEIVE
input.
Table 3–1 shows the responses expected from Line Terminating
Equipment (LTE), such as an STM-4/STM-1 multiplex section
terminating element, when presented with three possible error and
alarm conditions.
Table 3–1: LTE Responses to Errors and Alarms
Transmitted Error or
Alarm
Expected Upstream
Response
Expected Down-
stream Response
RS B1 Error
MS REI
none
MS AIS
MS RDI
AU AIS
HP RDI
none
HP RDI
LOS
MS RDI
AU AIS
1. Connect two CTS850s to an LTE as shown in Figure 3–4.
LTE
Downstream
Upstream
CTS 850 SDH/PDH Test Set
CTS 850 SDH/PDH Test Set
All Signals are
STM-1E
Figure 3–4: Setup to Check Error and Alarm Response
Summary of Contents for CTS 850
Page 4: ......
Page 24: ...Table of Contents xxiv CTS 850 SDH PDH Test Set User Manual...
Page 33: ...Getting Started...
Page 34: ......
Page 49: ...Operating Basics...
Page 50: ......
Page 105: ...Reference...
Page 106: ......
Page 169: ...Index...
Page 170: ......
Page 178: ...Index Index 8 CTS850 SDH PDH Test Set User Manual...