MAINTENANCE INSTRUCTIONS
98-01580-EN-R0_A4LT-E-ChemSaver-MaintenanceInstructions-TB.docx
2
E-CHEMSAVER MAINTENANCE
With proper equipment maintenance (as recommended by the equipment or chemical manufacturer), TeeJet solenoids are designed to provide up to
500 hours maintenance free operation. The following solenoid maintenance procedures should be performed on the solenoid or on individual nozzles
if leaks are observed at a specific spray nozzle.
Regular inspection of the e-ChemSaver is required for optimal functionality and proper operation under any circumstances.
External Inspection
The following parts should be visually inspected before each use.
Inspection Area
Procedure
Example
Gasket Seal
The correct gasket seal ensures a
proper connection of the cable.
In case of difficulty when connecting
the cable, apply special grease to
ensure a proper connection.
Gasket OK
Gasket Not OK
Tighten Tension between the
e-ChemSaver and the nozzle
body
Install by hand, tightening until a
complete block.
Rear Nut’s Tighten Tension
Install by hand, tightening until a
complete block. Afterwards ensure it
with an additional ¼ of turn with an
appropriate tool.
Summary of Contents for DYNAJET IC7 140
Page 1: ...DYNAJET IC7140 INSTALLATION SETUP USER MANUAL 98 05347 R1...
Page 73: ......