22
PMT - Rev. 05 - Sep/22
- Only
CAPABLE
and
AUTHORIZED
personnel must carry out the adjustments and
operations of the equipment.
- Observe every safety condition and use safety glasses, foot protection, earplugs/
muffs, protective gloves and any other required PPE.
- Do not carry out any adjustment while the equipment is working.
ATTENTION! RISK OF ACCIDENT
6. Set-up instructions
To couple the PMT on the combine harvester, approach the combine harvester head
to the coupling to fit the upper part.
Lift the equipment from the soil until it reaches the necessary height to fix the lower part
with the coupling locks (the locks may change according to the combine harvester model).
Then, assemble the cardan shaft.
To uncouple the PMT from the combine harvester, carry out the same procedures in
reverse order.
Hitching the equipment to a combine harvester
Summary of Contents for PMT
Page 1: ...OPERATOR S MANUAL PMT PMT...
Page 60: ...58 PMT Rev 05 Sep 22 11 Notes...
Page 62: ...www marchesan com br...