47
PMT - Rev. 05 - Sep/22
The simplest way to increase the equipment lifetime and to avoid interruptions during
the job is to execute a correct lubrication, as indicated below.
Every 24 hours of service, lubricate the joints through the grease fittings in the following
way:
- Be sure about the lubricant quality, with relation to its efficiency and purity, avoiding
the use of products contaminated by water, earth and others;
- Remove the remainder old grease around the articulations;
- Clean up all grease fittings with a cloth before introducing the lubricant and replace
the defective ones;
- Introduce an enough amount of new grease;
- Use grease of medium consistency;
- Lubricate the front bearings of the roller every 10 hours and the other lubrication
points every 50 hours.
-
BEARINGS:
Through the grease fittings, grease the transmission bearings, bushings
and articulation pin;
-
CHAINS:
Lubricate with oil and keep them tensioned;
- The oil tank has a capacity of 2 to 3 liters; always use
SAE 90
oil.
9. Maintenance
- Only
QUALIFIED
,
CAPABLE
and
AUTHORIZED
personnel must carry out the
maintenance of the equipment.
- Every maintenance must follow the recommendations that are included on the NR-12
(July/19 version) on the chapter 'maintenance, inspection, preparation, adjustment
and repairs' (from item 12.11.1 to 12.11.5).
- Observe every safety condition and use safety glasses, foot protection, earplugs/
muffs, protective gloves and any other required PPE.
- Remove the ignition key before carrying out any type of maintenance on the equipment.
If the equipment is not properly hitched, do not start the tractor engine.
- Every maintenance must be done when the equipment is turned off; it is also
recommended to uncouple the activating cardan(s) from the equipment to adjust it.
ATTENTION! RISK OF ACCIDENT
Lubrication
Summary of Contents for PMT
Page 1: ...OPERATOR S MANUAL PMT PMT...
Page 60: ...58 PMT Rev 05 Sep 22 11 Notes...
Page 62: ...www marchesan com br...