1D-18 Engine Mechanical: For M16A Engine with VVT
Timing Chain Cover Components
S5JB0A1416014
I5JB0A141020-01
1. Crankshaft pulley bolt
9. Oil gallery pipe No.1
17. Oil control valve
2. Crankshaft pulley
10. Copper washer
: 11 N
⋅
m (1.1 kgf-m, 8.0 lb-ft)
3. Oil seal
: Apply engine oil to oil seal lip.
11. Oil gallery pipe No.1 bolt
: 25 N
⋅
m (2.5 kgf-m, 18.0 lb-ft)
4. Timing chain cover
: Apply sealant 99000-31140 to the mating surface
of cylinder and cylinder head.
: Apply sealant 99000-31260 to the mating surface
of timing chain cover referring to the figure of Step 5)
of “Installation” under “Timing Chain Cover Removal
and Installation: For M16A Engine with VVT”.
12. Oil gallery pipe No.2
: 30 N
⋅
m (3.0 kgf-m, 22.0 lb-ft)
5. Pin
13. Oil gallery pipe No.2 bolt
: 150 N
⋅
m (15.0 kgf-m, 108.5 lb-ft)
6. Oil control valve mounting nut
14. Oil gallery pipe No.3
: Do not reuse.
7. Timing chain cover mounting bolts
15. Oil gallery pipe No.3 bolt
8. Timing chain cover mounting nut
16. O-ring
: Apply engine oil.
www.CarGarage.ir
www.CarGarage.ir
www.CarGarage.ir