Chapter 5
Servicing Infrastructure Boards and Components
5-15
b. Slide the power supply out of the system.
See
Section 3.6.3, “Removing a Power Supply” on page 3-18
.
3. Disconnect the top cover interlock cable from the power distribution board.
(
FIGURE 5-8
[1])
4. Disconnect the PDB ribbon cable from the power supply backplane.
5. Remove the four screws securing the L shaped bus bars from the PSU
backplane to the PDB.
6. Remove the No. 2 Phillips screw securing the PDB to the chassis. [2]
7. Grasp the bus bar and pull the PDB/bus bar assembly to the left, away from the
Paddle card.
8. Lift the PDB/bus bar assembly up and out of the system.
9. Place the PDB/bus bar assembly on an antistatic mat.
FIGURE 5-8
Removing the Power Distribution Board
5.5.2
Installing the Power Distribution Board
1. Install the old bus bar onto the new PDB module.
Do not tighten the screws at this time.
All 8 bus bar screws are tightened
only
after
the motherboard is installed. The 4 motherboard to bus bar screws are loosely
installed initially.
Summary of Contents for Fire X4440
Page 1: ...Sun Fire X4440 Server Service Manual Part No 820 3836 14 September 2010 Revision 01 ...
Page 10: ...x Sun Fire X4440 Server Service Manual September 2010 ...
Page 20: ...1 6 Sun Fire X4440 Server Service Manual September 2010 FIGURE 1 1 Cables SAS ...
Page 39: ...Chapter 2 Preparing to Service the System 2 13 ...
Page 40: ...2 14 Sun Fire X4440 Server Service Manual September 2010 ...
Page 64: ...3 24 Sun Fire X4440 Server Service Manual September 2010 ...
Page 84: ...4 20 Sun Fire X4440 Server Service Manual September 2010 FIGURE 4 9 Installing the Air Duct ...
Page 94: ...4 30 Sun Fire X4440 Server Service Manual September 2010 FIGURE 4 14 Installing a PCIe Card ...
Page 122: ...4 58 Sun Fire X4440 Server Service Manual September 2010 ...
Page 179: ...Chapter 6 Returning the Server to Operation 6 7 ...
Page 180: ...6 8 Sun Fire X4440 Server Service Manual September 2010 ...