Chapter 4
Servicing Motherboard Components
4-47
FIGURE 4-21
Installing a CPU- part 2
4.8.4
Installing an XOption CPU
1. Prepare the server for service.
a. Power off the server.
See
Section 2.5, “Powering Off the Server” on page 2-4
.
b. Disconnect the power cord (or cords) from the power supply (or supplies).
See
Section 2.5, “Powering Off the Server” on page 2-4
.
c. Slide the server out of the rack.
See
Section 2.7, “Removing a Server From the Rack” on page 2-8
.
d. Attach an antistatic wrist strap.
See
Section 2.8, “Performing Electrostatic Discharge and Antistatic Prevention
Measures” on page 2-10
.
Summary of Contents for Fire X4440
Page 1: ...Sun Fire X4440 Server Service Manual Part No 820 3836 14 September 2010 Revision 01 ...
Page 10: ...x Sun Fire X4440 Server Service Manual September 2010 ...
Page 20: ...1 6 Sun Fire X4440 Server Service Manual September 2010 FIGURE 1 1 Cables SAS ...
Page 39: ...Chapter 2 Preparing to Service the System 2 13 ...
Page 40: ...2 14 Sun Fire X4440 Server Service Manual September 2010 ...
Page 64: ...3 24 Sun Fire X4440 Server Service Manual September 2010 ...
Page 84: ...4 20 Sun Fire X4440 Server Service Manual September 2010 FIGURE 4 9 Installing the Air Duct ...
Page 94: ...4 30 Sun Fire X4440 Server Service Manual September 2010 FIGURE 4 14 Installing a PCIe Card ...
Page 122: ...4 58 Sun Fire X4440 Server Service Manual September 2010 ...
Page 179: ...Chapter 6 Returning the Server to Operation 6 7 ...
Page 180: ...6 8 Sun Fire X4440 Server Service Manual September 2010 ...