PolosSpin150i/200i
rev.: 1.0
Operating instruction
SPS-Europe B.V.
page
29
JH131115
6.8 Connecting Medias
All connections are located on system back side; all sockets are marked
appropriately as described in relative section.
DANGER!
Prior all media connecting check the system’s disconnection of the power supply.
DANGER!
In case corrosive, gassing or noxious wet media are applied, any peril to staff has to
be prevented by all means.
CAUTION!
The installation
of customer’s supply and disposal lines must conform to the
manufacturer instruction, chemical supplier information and relevant legal
regulation.
Connect media supply in this order:
1. Motor purge
2. Dry relays(Optional)
3. CDA (Optional)
4. Vacuum
6.9 Connecting to power supply
Power plug is located on system back side as described in relative section.
.
Make sure that the main switch is in <0/OFF> position and facility circuit breaker
turned off (if available).
Connect power cable to power supply system.
Turn on facility circuit breaker.
DANGER!
Connect the mains cable at last (after all connections) to the house power supply.
DANGER!
Each installation and operation work at electrical equipment must be done by
qualified personnel in compliance with legal regulations.
The valid national instructions (e.g. VDE) have to be followed. Prior all work check
the system’s disconnection of the power supply.
For detailed information and requirements, please refer to
appendixes, drawings
and section technical data.