9
Plumbi
ng
From
the
in
let
thru
hull
to
the
boost
pump
modu
le
and
from
the
boost
pump
modu
le
to
pump
module
inlet use supp
lied clear 3/4 (19m
m) sp
iral suction rated hose.
The outlet of the f
i
lter assemb
ly on
the main
module to the C
lark pu
mp as
semb
ly
is
under pres-
sure. U
se the supplied braided clear viny
l hose rated to 150 PSI (11 bar).
From
C
lark
pump
br
ine
di
scharge
connector
use
supplied
5/8
(15.9
mm)
c
lear
braided
viny
l
hose.
On the feed pressure side use the supplied Parker 1/2
tube
and fitting
s.
Use two
grab rin
gs on
the 1/2 park
er tubing. Refer to the park
er assembly in
structions.
The
remote
control
panel
can
be
mounted
anywhere
tha
t
is
dry
and
convenient.
Cut
a
4
-
9/16
”
(116
mm)
wide
by
2-
7/8”
(68mm)
hi
gh
openin
g
for
the
panel.
Lo
cat
e
in
an
area that
is
easily
v
is
ible
and
easy
to
manipulate
the
bu
t-
tons.
Use only Spectra approved re
mote cable.
The cable is not standard LAN cable or phone cord.
Re
mot
e Cont
r
ol Panel
Route
all
hoses
and
tubes
to
pr
event
kink
s
and
r
e
strictions.
Secure
piping
away
fr
om
mov
ing
ob
jects
such
as
engine
belts
and
hatches.
Pr
event chafe on tubing as r
equir
ed.
T
e
st and inspect all piping and
hose clamps after
several hours of operation.
Summary of Contents for NEWPORT 400 Mk II
Page 2: ...2 ...
Page 15: ...15 John Guest Super Speedfit ...
Page 22: ...22 ...
Page 49: ...49 Z BRANE OPERATION MANUAL ...
Page 53: ...53 ...