5
Unpack the system and inspect it to make sure that it has not been d
amaged in sh
ipment.
Refer
to the
shippin
g
l
ist
for
your
system
to
make
sure
you
have
rec
eived
all
of
the
compo-
nents
listed.
Do
not
discard
any
pa
ckagin
g
until
you
have
found
and
identified
all
of
the
parts. The smal
l
instal
lation parts are listed on the cellophane bags’ pick
li
st.
We
will
not
be
held
responsible
for
shortages
and
or
freight
damage
that
are
not
reported
within thirty days of the ship dat
e.
Next,
study the
system
layout
diagram,
component
photos
and
descriptions
before
b
eginn
in
g
your instal
lation. Th
is
wi
l
l ass
ist you in understandin
g the function of each component.
Layout
th
e
system.
Before
starting
the
instal
lation
identify
the
location
where
each
module
and
component
wil
l
be
p
laced.
Ensure
that
th
ere
is
proper
clearance
around
th
e
components
for removal of f
ilters and sy
stem service. A
lso, check to make sure you have adequat
e tubing
and
hose
befor
e
star
ting,
so
addit
ional
parts
may
be
ordered
if
necessary.
Che
ck
to
see
that
the MPC c
able is lon
g enou
gh to reach from the display
location to the fe
ed pump module.
Ne
wport Mk
I
I
shipping list:
Newport Feed Pump Module
Hi
gh Pressure Clark Pump and Reverse Osmos
is
Membrane Module
MkII Fresh Water Flush Modu
le
MkII Installation
Kit
Boost Pump Module
Newport Serv
ice Kit
1/2” braided hose (10’)
1/2” Black Nylon tube (10’)
5/8” Hose (25’)
3/4” Suction Hose (25’)
3/4” Braided Hose (10’)
Getting S
tarted
Summary of Contents for NEWPORT 400 Mk II
Page 2: ...2 ...
Page 15: ...15 John Guest Super Speedfit ...
Page 22: ...22 ...
Page 49: ...49 Z BRANE OPERATION MANUAL ...
Page 53: ...53 ...