2-1
DSR-80/80P/60/60P
SECTION 2
INSTALLATION
Be sure to install the DSR-80/80P/60/60P in location satisfying the required operational environment described below to
assure the DSR-80/80P/60/60P superior performance and to maintain the excellent serviceability and accessibility.
2-1. INSTALLATION PROCEDURE
2-2. OPERATIONAL ENVIRONMENT
.
Operating temperature :
+
5
d
C to
+
40
d
C
.
Humidity
: 80 % or less
.
Storage temperature
:
_
20
d
C to
+
60
d
C
.
Locations to avoid
:
.
Areas where the unit will be exposed to direct sunlight or any other strong lights.
.
Dusty areas or areas where it is subject to vibration.
.
Areas with strong electric or magnetic fields.
.
Areas near heat sources.
(Good air circulation is essential to prevent internal heat build-up. Place the unit in location
with sufficient air circulation. Do not block the ventilation holes on the cabinet and the rear
panel.)
.
Horizontal condition
: within
±
30
d
2-3. OPERATING VOLTAGE
.
Power voltage
: AC 100 V to 120 V / (UC)
AC 200 V to 240 V / (CE)
.
Power frequency
: 50/60 Hz
.
Power consumption : (UC) : 85 W/DSR-60, 140 W/DSR-80/80P
(CE) : 87 W/DSR-60P, 145 W/DSR-80P
START
DETERMINATION OF
INSTALLATION PLACE
UNPACKING
RACK MOUNTING
CONNECTORS
INITIAL SETUP
OPERATION CHECK
END
· · · 2-2. OPERATIONAL ENVIRONMENT
· · · 2-3. OPERATING VOLTAGE
· · · 2-4. INSTALLATION SPACE
· · · 2-5. SUPPLIED ACCESSORIES
· · · 2-7. RACK MOUNTING
· · · 2-8-2. MATCHING CONNECTORS
· · · 2-8-3. INPUT/OUTPUT SIGNALS OF THE CONNECTORS
· · · 2-9. INSTALLATION SETUP AND ADJUSTMENT
· · · If an error message is shown on the time counter, refer to
“3-3. ERROR MESSAGE” in SERVICE MANUAL VOL. 1.
Summary of Contents for DVCAM DSR-60
Page 2: ......
Page 54: ......
Page 174: ......
Page 220: ......
Page 236: ......
Page 238: ...8 2 N DSR 80 80P 60 60P SY 241B 241 CV101 CHARA SIZE 10 1 N DSR 60 80 ...
Page 242: ...8 2 P DSR 80 80P 60 60P SY 241B 241 CV101 CHARA SIZE 10 1 P DSR 60P 80P ...
Page 284: ......