SETSCREW
fLANGE L
CAP
T-Tension
Arm Height Adjustment
1.
Loosen the setscrew.
2.
Set the machine in
mode. While checking
that the tape does not curl along the timer roller,
adjust the height of T -tension arm by turning the
cap
that the tape
3.
Set the machine in the REV
SHUTTLE
mode.
Adjust again that there is no tape curl along the
timer
roller
and the curl becomes
as small as
possible along T -tension arm.
4.
When the mode is changed
from F.FWD to REV
x 1 SHUTTLE,
check
that
the curl does not
along the timer roller and T-tension arm.
If changed, perform
Step 2 through 4 again.
5.
Tighten the setscrew.
10-3-4.
Note:
When rentacmz the T ..tension arm
assemniv
SETSCREW
Timer Roller
Note:
The
of
timer roller and T ..tension
arm influences
each other.
If necessary,
adjust
the height
of T -tension
1.
Check
that
the screw of flange U is tightened.
2.
Loosen the setscrew.
3.
Set the machine
the REC mode.
Adjust
the
height
of the timer roller by turning
the flange
U so that the tape touches
flange U lightly with-
out curl.
4.
that the screw of
flange U is tightened.
Note 1: When
timer
the
to
pages D..21
D-22 in section
manual
or
VOL.4 (for PS). After replacement,
perform
the adjustment
of this item,
and then perform
the servo adjustment
in section
11 ..1.
Note 2: When
replacing
the
roller
section,
the
in
accordinz
to
3-23-1.
0-3-5.
CAP
1.
Loosen the setscrew.
2.
Set the machine
in the REC mode. Adjust
the
height of the guide
turning the cap so that the
tape touches
flange
lightly without
curl.
3.
Tighten the setscrew.
FLANGE L
Lower.
Note:
Do not adjust the guide post
1 unless absolutely
necessary.
Note:
When replacing the components
of this guide, refer to Section 6-5.
Fig. 10-3-6.
BVH-2000( U/C)/PS/PM
BVH-2500(U/C)/P
10-5
3.
I-
Z
UJ
~
Z
(9
...J
~
~
UJ
I-
C/)
>-
C/)
I
I-
~
0...
UJ
0...
~
I-
Summary of Contents for BVH-2000
Page 1: ...he handles available panels are optional Iy ...
Page 4: ......
Page 11: ......
Page 43: ......
Page 45: ......
Page 46: ......
Page 73: ......
Page 87: ......
Page 91: ......
Page 92: ......
Page 105: ......
Page 106: ......
Page 114: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 139: ......
Page 141: ......
Page 149: ......
Page 150: ......
Page 155: ......
Page 161: ......
Page 163: ......
Page 179: ......
Page 181: ...ARM 1 C C C ilr l I ...
Page 185: ......
Page 191: ......
Page 195: ......
Page 201: ......
Page 203: ......
Page 219: ......
Page 221: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......
Page 229: ......
Page 239: ......
Page 245: ......
Page 250: ...z o i a o LL Z BVH 2000 U C PS PM BVH 2180 U C PS PM ...
Page 257: ......
Page 259: ......
Page 265: ......
Page 269: ......
Page 305: ......
Page 323: ......
Page 344: ......
Page 370: ...15 ...
Page 371: ......
Page 375: ......
Page 388: ...of Standard Load for Output Check POWER UNIT 1 Standard for Variable a w o a 0 ...
Page 396: ...CN921 8 1 Spec CN921 8 5 Spec hoard BVH 2000 U C PS PM BVH 2500 U C P on ON 100 OFF 5 ...
Page 401: ......
Page 435: ......
Page 449: ......
Page 452: ......
Page 462: ......
Page 471: ......
Page 476: ......
Page 480: ......
Page 482: ... o w o ...
Page 484: ......
Page 492: ......
Page 494: ...80 U C ...
Page 496: ......
Page 497: ......
Page 498: ...14 2 BVH 2000 U C PS PM BVH 2500 U C P 80 U C PS PM w l j j Capstan Ree Servo Check ...
Page 500: ...lel pin 3 12 0 01 Vdc RVl TP5 EQ 02 NG Edge Can nectar Pin 21 B A B R138 w I U U ...
Page 504: ......
Page 505: ...BVH 2000 U C 3 673 996 22 Volume 1 1985 Printed in Japan 1985 4 09 ...