Brake Band
Guide
Position
Adjustment
15. Turn the side marked "A, JB-372" of the brake adjustment
in
and
onto
reel
(see
3-27).
16. While
pressing
the brake
band
guide lightly against
the
brake adjustment
fixture, fix the brake band guide with the
three PSW3x8
screws.
Remove
brake
fixture.
Link Stopper
Position
Adjustment
18.
Place the brake link onto the brake post and fix it with E
ring
8)
Fig. 3-26).
Place the
link
the
link.
20.
Lightly fix the brake solenoid assembly with the screw
CD .
21.
While pressing
the plunger
by hand, turn the side "'B" of
the brake adjustment
fixture in front and place it onto the
reel motor
Do
and
link
stopper so that the clearance
between the link stopper and
the brake
link (top) is the value shown
in Fig. 3-28.
When the
been
adjust
of
the
brake
solenoid
so
that
the
brake
band
is
not
transformed
at the
"X"
and
"Y"
locations
shown in Fig. 3-
28. and the clearance
between the brake adjustment
fixture
0.2
or
all
location.
the
fix the brake solenoid
PSW3x8
screw.
24.
While pressing
the plunger,
remove the brake adjustment
fixture.
Clean
the
the
table
in contact
the
band) and
the plunger
by hand,
place the reel table onto
the reel
motor shaft.
26.
While pushing
reel table lightly to the reel motor, fix it with
two
BVH-2000(U/C)/PS/PM
BVH-2180(U/C)/PS/PM
BVH-2500( U/C)/P
BRAKE
ADJUSTMENT
FIXTURE
3-27.
Brake Band Guide Position Adjustment
BRAKE
LINK
(top)
LINK STOPPER
Fig. 3-28.
Link Stopper/Brake
Solenoid Position
Adjustment
3-23
UJ
U
z
«
z
UJ
I-
Z
<[
~
o(j
u
o
o
Summary of Contents for BVH-2000
Page 1: ...he handles available panels are optional Iy ...
Page 4: ......
Page 11: ......
Page 43: ......
Page 45: ......
Page 46: ......
Page 73: ......
Page 87: ......
Page 91: ......
Page 92: ......
Page 105: ......
Page 106: ......
Page 114: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 139: ......
Page 141: ......
Page 149: ......
Page 150: ......
Page 155: ......
Page 161: ......
Page 163: ......
Page 179: ......
Page 181: ...ARM 1 C C C ilr l I ...
Page 185: ......
Page 191: ......
Page 195: ......
Page 201: ......
Page 203: ......
Page 219: ......
Page 221: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......
Page 229: ......
Page 239: ......
Page 245: ......
Page 250: ...z o i a o LL Z BVH 2000 U C PS PM BVH 2180 U C PS PM ...
Page 257: ......
Page 259: ......
Page 265: ......
Page 269: ......
Page 305: ......
Page 323: ......
Page 344: ......
Page 370: ...15 ...
Page 371: ......
Page 375: ......
Page 388: ...of Standard Load for Output Check POWER UNIT 1 Standard for Variable a w o a 0 ...
Page 396: ...CN921 8 1 Spec CN921 8 5 Spec hoard BVH 2000 U C PS PM BVH 2500 U C P on ON 100 OFF 5 ...
Page 401: ......
Page 435: ......
Page 449: ......
Page 452: ......
Page 462: ......
Page 471: ......
Page 476: ......
Page 480: ......
Page 482: ... o w o ...
Page 484: ......
Page 492: ......
Page 494: ...80 U C ...
Page 496: ......
Page 497: ......
Page 498: ...14 2 BVH 2000 U C PS PM BVH 2500 U C P 80 U C PS PM w l j j Capstan Ree Servo Check ...
Page 500: ...lel pin 3 12 0 01 Vdc RVl TP5 EQ 02 NG Edge Can nectar Pin 21 B A B R138 w I U U ...
Page 504: ......
Page 505: ...BVH 2000 U C 3 673 996 22 Volume 1 1985 Printed in Japan 1985 4 09 ...