(9-1-2. Board Setti nqs]
2. VV-Ol
Board
Setting
Install the switching regulator adjustment
fixture.
See section 9-1-1.
Step 2.
Remove the two screws securing the VV-01 hoard as follows.
Remove.
D
CN
0
~
927
@
DCN924
@OCN922
@
CN923D
=
0
CN926
CN925
D
CN9290
Step 3.
Connect the connectors CN921. 922. 923.926.927.928
and 929 of
the extension
cahle assy to the connector
panel of the power
unit.
I-
Z
w
~
Z
19
-l
«
>-
-l
0-
0-
:::J
C/)
a:
w
~
o
0-
0)
Disconnect
the connectors CN20L 202 and 203 connecting
the
VV-Ol hoard
and the other
hoards
and
also remove
the
connectors CN 102. 104 and 106 connecting the FY-01 hoard and
the other hoards
hecause the leads of CN 102. 104 and 106
ohstruct the
vv-o
1 hoard removal.
After pulling the VV-Ol hoard from the power unit turn the VV-
01 hoard 180
0
and insert it into the guide rail of the hoard fixture
and fix it with the hoard holder.
5.
Connect
the connectors
CN102. 104. 106. 201. 202 and 203
removed at step 4 to the proper positions on the FY-Ol and VV-
01 hoards.
6.
Connect the connectors
CN924 and 925 of the extension cable
assy to the corresponding
connectors
on the VV-O1 hoard.
VV-01,CN201
_AC-39,CN307
VV-Ol
,CN202-FV-Ol,CN1
07
VV-Ol,CN203-FV-0I,CN107
F V-O 1.CN 102 -AC-39.CN305
FV-Ol,CN1
04 -AC
-39.CN 311
F V -01 ,CN1 06 --FV
-o2f:,N602
7.
Turn on the power and perform the VY-Ol hoard operation
check and adjustment.
The work must he performed in a short
time.
Step 8.
After performing
the operation check and adjustment
turn the
power off and disconnect
the power cord.
After passing five minutes or more. reinstall the Y-Y-Olboard to
the power unit in reverse order of the ahove steps.
9-6
BVH-2000(U/C)/PS/PM,
BVH-2180(U/C)/PS/PM
BVH-2500(U/C)/P
Summary of Contents for BVH-2000
Page 1: ...he handles available panels are optional Iy ...
Page 4: ......
Page 11: ......
Page 43: ......
Page 45: ......
Page 46: ......
Page 73: ......
Page 87: ......
Page 91: ......
Page 92: ......
Page 105: ......
Page 106: ......
Page 114: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 139: ......
Page 141: ......
Page 149: ......
Page 150: ......
Page 155: ......
Page 161: ......
Page 163: ......
Page 179: ......
Page 181: ...ARM 1 C C C ilr l I ...
Page 185: ......
Page 191: ......
Page 195: ......
Page 201: ......
Page 203: ......
Page 219: ......
Page 221: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......
Page 229: ......
Page 239: ......
Page 245: ......
Page 250: ...z o i a o LL Z BVH 2000 U C PS PM BVH 2180 U C PS PM ...
Page 257: ......
Page 259: ......
Page 265: ......
Page 269: ......
Page 305: ......
Page 323: ......
Page 344: ......
Page 370: ...15 ...
Page 371: ......
Page 375: ......
Page 388: ...of Standard Load for Output Check POWER UNIT 1 Standard for Variable a w o a 0 ...
Page 396: ...CN921 8 1 Spec CN921 8 5 Spec hoard BVH 2000 U C PS PM BVH 2500 U C P on ON 100 OFF 5 ...
Page 401: ......
Page 435: ......
Page 449: ......
Page 452: ......
Page 462: ......
Page 471: ......
Page 476: ......
Page 480: ......
Page 482: ... o w o ...
Page 484: ......
Page 492: ......
Page 494: ...80 U C ...
Page 496: ......
Page 497: ......
Page 498: ...14 2 BVH 2000 U C PS PM BVH 2500 U C P 80 U C PS PM w l j j Capstan Ree Servo Check ...
Page 500: ...lel pin 3 12 0 01 Vdc RVl TP5 EQ 02 NG Edge Can nectar Pin 21 B A B R138 w I U U ...
Page 504: ......
Page 505: ...BVH 2000 U C 3 673 996 22 Volume 1 1985 Printed in Japan 1985 4 09 ...