17
8.
Use of the pellet-run boiler
Recommendations
Before starting up the unit, please check the following:
Guarantee that the boiler is properly connected to the power mains by
means of the 230 VAC power cable.
Figure 8 – Electric power plug.
Check to see whether the pellet reservoir is supplied with pellets.
Inside thepellet reservoir is a safety grid to prevent users from reaching
theworm screw.
Always check whether the burner is unblocked before igniting the
boiler.
The boiler's combustion chamber, as well as its doors, are made of iron
plate painted with high temperature resistant paint. Fumes are released during
the initial burning sessions due to the curing of this paint.
Avoid touching the unit during its first burn to prevent leaving permanent
marks on the paint. The paint goes through a more plastic phase during the
curing process. The curing of the paint occurs at approximately 300ºC and for
30 minutes.
Ensure that the hydraulic circuit was correctly assembled and is connected
to the water supply;
Summary of Contents for SZM A 18 KW
Page 15: ...12 b c Figure 6 Examples of standard installations ...
Page 50: ...47 a b Figure 27 b and c a b ...
Page 82: ...79 Figure 68 Electrical diagram of the external silo s circuit board ...
Page 87: ...84 ...
Page 88: ...85 ...
Page 89: ...86 ...