49
procedure used for adjusting the sensitivity – rotate clockwise to increase
the response time and counter clockwise to decrease the response time.
The response time should be set to the minimum value
Installing the storage unit on the right side of the boiler
The level sensor of the storage unit must always be installed on the side
closest to the boiler.
1 – If you want to install the storage unit on the right side of the boiler
you must install the level sensor on the left side of the storage unit, in the
same place where he comes assembled by default. Before, you should
disconnect the plug of the cable connected to the circuit board, to
facilitate the assembly. To fasten it, you should use the screws previously
removed, and put it in the position shown in Figure 29-b.
a)
b)
Figure 29 – Installing the sensor level in the storage unit
2 – Then, you should install the ramp to drop the pellets in the boiler’s
internal tank. For this, you should start by removing the right side cover
of the boiler’s tank – removing the 4 screw securing it (Figure 30).
Summary of Contents for SZM A 18 KW
Page 15: ...12 b c Figure 6 Examples of standard installations ...
Page 50: ...47 a b Figure 27 b and c a b ...
Page 82: ...79 Figure 68 Electrical diagram of the external silo s circuit board ...
Page 87: ...84 ...
Page 88: ...85 ...
Page 89: ...86 ...