43
(at least until the level sensor detects pellets) and reset the error (see
automatic boiler instruction manual).
The wood pellet storage unit can be installed on either the left or right
side of the boiler. By default, it is configured to be installed on the right
side of the boiler.
For greater ease you should proceed to the assembly and
adjustment of the storage unit before installing the boiler.
Adjusting the height of the boiler
With the boiler placed in its final position, and before starting the
installation of the storage unit, you should level the boiler and put it at the
same height of the storage unit. To do so, you should place the storage
unit beside the boiler (left or right) and adjust the leveling feet of this
until it is aligned with the storage unit by the upper zone, as shown in the
following pictures.
Figure 21 – Adjusting the height of the boiler
Summary of Contents for SZM A 18 KW
Page 15: ...12 b c Figure 6 Examples of standard installations ...
Page 50: ...47 a b Figure 27 b and c a b ...
Page 82: ...79 Figure 68 Electrical diagram of the external silo s circuit board ...
Page 87: ...84 ...
Page 88: ...85 ...
Page 89: ...86 ...