53
7 – To make the fixing of the storage unit to the boiler you will have to
remove the upper lids of the storage unit. Remove the 2 screws at the
back (Figure 35-a); open the front lid and remove the 3 screws that
secure the lids to the central bar (Figure 35-c).
a)
b)
c)
d)
Figure 35 – Removing the upper lids
Summary of Contents for SZM A 18 KW
Page 15: ...12 b c Figure 6 Examples of standard installations ...
Page 50: ...47 a b Figure 27 b and c a b ...
Page 82: ...79 Figure 68 Electrical diagram of the external silo s circuit board ...
Page 87: ...84 ...
Page 88: ...85 ...
Page 89: ...86 ...