background image

1

  Unpacking

 

Navien 

Condensing 

Boiler

User’s Information 

Manual, Installation 

& Operation Manual

Air Vent

Wall Flanges

Conversion Kit

Wall Mounting 

Bracket

Tapping screws 

and anchors

Pressure Relief Valve, 

Heating

Vent Termination 

Caps

Air Vent 

Bushing  

(

3

/

in to 

1

/

in)

Outdoor 

Temperature Sensor 

and Cable

Condensate Trap

System Temperature Sensor

Model

NFB-175/200

Quick Installation Guide

STEP 1  Before Installing

Read the Installation & Operation Manual before installing. 

This product must be installed and serviced by a licensed plumber, 

a licensed gas fitter, or a professional service technician. Navien is 

not liable for any damages or defects resulting from improper 

installation.

 WARNING

Follow all local codes and/or the most recent edition of the National Fuel Gas Code (ANSI 

Z223.1/NFPA 54) in the USA, or the Natural Gas and Propane Installation Code in Canada 

(CAN/CGA B149.1).

Safety

DO NOT install the boiler in areas with excessively high humidity.

Location Requirements

Select the best location on “Choosing an Installation Location” in the Installation & 

Operation Manual.

Allowable minimum clearances

Top

Back

Side

Side

Front

Bottom

Clearance

Indoor Installation

Top

9 in (229 mm) minimum

Back

0.5 in (13 mm) minimum

Front

4 in (100 mm) minimum

Sides

3 in (76 mm) minimum

Bottom

12 in (300 mm) minimum

STEP 2  Installing

  Checking the Rating Plate

 >

 

This boiler is configured 

for Natural Gas from the 

factory. If conversion to 

Propane Gas in required, 

the conversion kit supplied 

with the boiler must be 

used.

 WARNING

 

·

Before connecting the gas supply, determine the gas type and pressure for the boiler by 

referring to the rating plate. Use only the same gas type indicated on the rating plate. Using a 

different gas type will result in abnormal combustion and malfunction of the boiler. Gas 

supplies should be connected by a licensed professional only.

 

·

The appliance and its gas connection must be leak tested before placing the appliance in 

operation.

 

·

This boiler cannot be converted from natural gas to propane or vice versa without a Navien gas 

conversion kit. Do not attempt a field conversion of this boiler without a Navien gas conversion 

kit. Doing so will result in dangerous operating conditions and will void the warranty.

Navien Inc. is not liable for any property damage and/or personal injury resulting from 

improper conversions.

  Mounting on the Wall

 >

 

 CAUTION

Do not install the boiler on dry walls without proper reinforcement.

Drill in the supplied anchor bolts 

after considering where the vent 

termination will be located.

1

Lift up the boiler, rest the unit on the hooks 

provided on the wall bracket on the wall.

Secure the mounting bracket to the wall 

with the tapping screws and anchors.

2

  Removing the Front Cover

 >

 

Unclasp the 4 buckles that fix 

the cover to the boiler, and then

remove the cover by lifting it 

and pulling it outward

2

3

Reviews: