59
5 – The level sensor must be assembled on the right side of the storage
unit (on the closest side to the boiler). For this, you must change the
position of the sensor in the mounting plate in which it is fixed:
- remove the level sensor of the mounting plate, by removing the 4
screws that secure it;
a)
b)
Figure 43 – Removing the level sensor from the mounting plate
- To assemble the sensor on the opposite side of the mounting plate
you should mount it as shown in the following figure:
a)
b)
Figure 44 – Assembling the level sensor on the mounting part
- Finally, you can mount the two mounting plates at the bottom of the
storage unit, putting the plate with the level sensor on the right side and
the plate without level sensor on the left side. The level sensor must be
assembled as shown in Figure 45-c.
Summary of Contents for SZM A 18 KW
Page 15: ...12 b c Figure 6 Examples of standard installations ...
Page 50: ...47 a b Figure 27 b and c a b ...
Page 82: ...79 Figure 68 Electrical diagram of the external silo s circuit board ...
Page 87: ...84 ...
Page 88: ...85 ...
Page 89: ...86 ...