Installation for exhaust gas systems:
•
The construction of the exhaust pipe must be suitable for the purpose in accordance
with local requirements and in compliance with the regulations in force.
• As shown in figure 40, the exhaust duct must be so arranged that cleaning and
maintenance are ensured by insertion of the inspection points. The insert contains a
registration cover in the smoke box for cleaning.
• Under nominal operating conditions, the drawdown of the combustion gases must
give rise to a depression of 12 Pa, measured 1 meter above the chimney neck.
• The insert can not share the chimney with other equipment.
• Tubes outside the site of u
se must be double insulated in stainless steel, with an
internal diameter of 80 mm.
• The exhaust pipe can generate condensation, in th
is case it is advisable to establish
suitable condensate collection systems.
8.1.
Installing Without a Chimney
The installation of the pellet insert when there is no chimney should occur, as in figure
40, bringing the exhaust pipe (with a minimum internal diameter of 80 mm) directly
out and above the roof.
Double-walled insulated stainless steel pipes should be used properly to avoid
condensation.
Provide at the base of the tubing a T for periodic inspections and annual maintenance,
as exemplified in figure 40.
Summary of Contents for EARTH 9KW
Page 35: ...34 a b Attention Do not use 90º curves c Figure 31 Examples of installations ...
Page 101: ...100 ...
Page 102: ...101 ...
Page 103: ...102 ...
Page 114: ...113 25 Annexes 25 1 Flow chart Lighting ...
Page 115: ...114 ...
Page 116: ...115 Disabling ...