18
Figure 13
–
Installation of the pellet insert
•
The option to install a system to channel the air is only available for the version of
WIND, due to its construction, designed with superior load. To install the system you
must follow the following steps:
1º- Ensure that the fixed part of the insertable pellets is in its definitive place.
2º- The pellet loading tube installation must be carried out in the same way. Add a pipe
to channel the air (aluminum tube 100 mm in diameter) with the grid to be fixed to the
wall. It is recommended to make this union with a metal clamp. The length of the
aluminum tube should be sufficient to reach the air outlet, located on the top of the
chassis. It is necessary to repeat this step to place the second tube.
3º- To access the top of the cover (see Figure 17). It can be observed that the upper
part comes with the installation of 2 air outlets of 100 mm, with a pliers cut the micro
joints to install the tubes for the ducted hot air.
Figure 18
–
Insertable pellet installation
Summary of Contents for EARTH 9KW
Page 35: ...34 a b Attention Do not use 90º curves c Figure 31 Examples of installations ...
Page 101: ...100 ...
Page 102: ...101 ...
Page 103: ...102 ...
Page 114: ...113 25 Annexes 25 1 Flow chart Lighting ...
Page 115: ...114 ...
Page 116: ...115 Disabling ...