87
17.2.
Installation of the frame on the equipment
With the fixed insert and the tripartite frame prepared, the next step is to assemble the
two. Open the safety catch of the insert, remove the insert to work comfortably. On
each side of the insert we have two screws (Din 967 M4x8mm), it is necessary to
slightly loosen these screws. (See Figure 50).
Figure 41 - Locating the screws to attach the frame to the insert
Insert the frame, aligning the insertable bolts with the frame flaps, insert the frame,
line up in front of the insert and tighten the screws again to secure the rim (See Figure
51). Place the insert in its operating position and close the two safety latches, if the
wall is sensitive to marks it is recommended to leave 1 or 2 mm distance between the
rim and the wall.
Summary of Contents for EARTH 9KW
Page 35: ...34 a b Attention Do not use 90º curves c Figure 31 Examples of installations ...
Page 101: ...100 ...
Page 102: ...101 ...
Page 103: ...102 ...
Page 114: ...113 25 Annexes 25 1 Flow chart Lighting ...
Page 115: ...114 ...
Page 116: ...115 Disabling ...