22
Figure 17
–
Installing the display outside the device
5. With all the support fixed to the wall, the display can be placed on the finishing
frame, fixing the display from the front and the box from the rear. We have to connect
the two wires of the display and must take into account that the length must be
enough to be able to remove without creating any problem or tension or interference of
the cable. Finally, the frame must be fitted with the display by attaching the bolts to
the fixing springs as shown in figure 25.
Figure 18
–
Installing the display outside the device
Temperature probe installation
• The pellet inserts have a probe to measure the ambient temperature.
For a correct
reading of the ambient temperature, this probe must be located on the exterior in a
place where it does not receive direct radiation or hot air from the equipment. It is
sufficient to drill a hole in the wall and fix the box screwed or glued, leaving the end of
the probe inside. Sufficient length of cable must be left so that the moving part of the
equipment can be removed without causing strain on the cable and does not interfere
with the movement of the equipment guides.
Summary of Contents for EARTH 9KW
Page 35: ...34 a b Attention Do not use 90º curves c Figure 31 Examples of installations ...
Page 101: ...100 ...
Page 102: ...101 ...
Page 103: ...102 ...
Page 114: ...113 25 Annexes 25 1 Flow chart Lighting ...
Page 115: ...114 ...
Page 116: ...115 Disabling ...