12
•
After securing the base of the equipment and the chimney being installed place the
moving part of the equipment as shown in figure 7.
Figure 7
–
Installation
•
Then do a rotating motion to bring the equipment to the horizontal.
Figure 8
–
Installation
•
Push the movable part to the wall so that it slides on the rails. Check the
correct sliding and that everything is properly attached before continuing with the
intallation. Move the equipment to the end of runner system with open safety latches
Summary of Contents for EARTH 9KW
Page 35: ...34 a b Attention Do not use 90º curves c Figure 31 Examples of installations ...
Page 101: ...100 ...
Page 102: ...101 ...
Page 103: ...102 ...
Page 114: ...113 25 Annexes 25 1 Flow chart Lighting ...
Page 115: ...114 ...
Page 116: ...115 Disabling ...