98
Figure 58
–
Smoke box cover
To remove the baffles, you first have to remove 2 M6x20 DIN 912 screws as shown in
figure 69. Clean the inside of the smoke box and replace the
baffles.
Figure 59
–
Smoke box deflectors
Finally, replace all the parts in reverse order of their disassembly, finally close the
safety locks under the door.
NOTICE! The frequency of maintenance tasks depends on the quality of
the pellets.
Summary of Contents for EARTH 9KW
Page 35: ...34 a b Attention Do not use 90º curves c Figure 31 Examples of installations ...
Page 101: ...100 ...
Page 102: ...101 ...
Page 103: ...102 ...
Page 114: ...113 25 Annexes 25 1 Flow chart Lighting ...
Page 115: ...114 ...
Page 116: ...115 Disabling ...