15
Instalation WIND 9kW
In case of the Wind 9kW it will be necessary to install the pellet feeding system. To
install this loading system it is necessary to open a 330x330 mm hole.
•
The position of the loading system has to maintain a ratio where X is always less than
Y = X * 0.7. (See Figure 13), so that we can ensure that the slope is sufficient so that
the pellets are not trapped in the tube connecting the loading mouth with the top of
the insert structure. The loading mouth can be installed in any of the walls that form
the surroudings where the equipment is installed, either to the right or to the left, as in
the front or rear, if the layout of the house allows it. It is always necessary to respect
the minimum distances X = 390 mm, Y = 275 mm Example: X = 450 mm Y = 450x0.7
= 315 mm (minimum).
•
The tube used to attach to the loading mouth and top of the insert chassis must have
an internal diameter of 200mm and must be rigid enough not to deform when the
pellets fall inside. It is recommended to apply flexible aluminum tube.
•
To attach the drop tube of the pellets to the loading mouth of the top of the insert
chassis it is recommended to use metal clamps. This type of clamps provides good
clamping and sealing, and it is possible to open or close the clamp when necessary.
Figure 9
–
Feeding system installation
Summary of Contents for EARTH 9KW
Page 35: ...34 a b Attention Do not use 90º curves c Figure 31 Examples of installations ...
Page 101: ...100 ...
Page 102: ...101 ...
Page 103: ...102 ...
Page 114: ...113 25 Annexes 25 1 Flow chart Lighting ...
Page 115: ...114 ...
Page 116: ...115 Disabling ...