17
Figure 12
–
Equipment installation
5º- When opening the lid, the inner parts are positioned to facilitate the loading of the
pellets, for this reason it is very important that the cargo mouth is always placed in the
position shown in Figure 16.
6º- As shown in Figure 16, the WIND version has a top chassis attached to the side
columns by means of DIN912 M6 screws and DIN934 nuts. Unscrew without
completely removing the front screws (marked with the letter "A"), the cap rotates
over the rear screws, making the top cover accessible to facilitate attachment of the
flexible tube to the pellet gargle. It is necessary to join the tube leaving the loading
mouth with the cap through a metal clamp, it is necessary to make sure that the tube
has no curves where they can
Accumulate pellets. Finally, place the cover in its original position and fix the screws
again.
Summary of Contents for EARTH 9KW
Page 35: ...34 a b Attention Do not use 90º curves c Figure 31 Examples of installations ...
Page 101: ...100 ...
Page 102: ...101 ...
Page 103: ...102 ...
Page 114: ...113 25 Annexes 25 1 Flow chart Lighting ...
Page 115: ...114 ...
Page 116: ...115 Disabling ...