Commissioning
8.5 Commissioning with the STARTER commissioning tool
SINAMICS DCM DC Converter
Operating Instructions, 12/2018, A5E34763375A
313
⇒
Select the field control:
●
[0] No field
●
[1] Field also switched with the main contactor
●
[2] Standstill field at >= o7.0 (factory setting)
●
[3] Field is continuously switched on
●
[4] Field also switched with signal auxiliaries ON
●
[21] External field device, otherwise the same as position 1
●
[22] External field device, otherwise the same as position 2
●
[23] External field device, otherwise the same as position 3
●
[24] External field device, otherwise the same as position 4
⇒
Select whether the EMF-dependent field weakening should be activated or deactivated.
Note
If Field weakening is activated, then a valid field characteristic must be available (p50117 =
1), otherwise, the optimization run for field weakening (p50051 = 27) must be carried out.
⇒
Depending on the selection under Field control, the values for field supply voltage,
standstill field (%) and delay time can be set.
⇒
Click Next >