Commissioning
8.2 Switching on
SINAMICS DCM DC Converter
272
Operating Instructions, 12/2018, A5E34763375A
With the basic operator panel BOP20:
(1)p0009 = 30
(1)p0976 = 1
SINAMICS DCM resets all of the parameters to the factory setting, and executes a power on.
The parameters must then be permanently saved by pressing the P button for a longer
period of time (at least 3 seconds, however until the display starts to flash).
8.2
Switching on
After the device is turned on (POWER ON), the drive powers up. Power-up up to operating
state 7.0 in the SINAMICS DCM with the parameters saved (RAM to ROM was carried out)
takes approx. 45 s. Power-up without the saved parameters (first commissioning) takes
approx. 60 s.
Table 8- 1
SINAMICS DCM ramp-up times
BOP20 display
CUD LED status
Ramp-up time
1)
Light on the BOP20
RDY: Red
DP1: Red
POWER ON
-
RDY: orange
DP1: -
15 s
Display "run up"
RDY: orange
DP1: -
35 s
Operating state 12.4
RDY: Green
DP1: -
40 s
Operating state 7.0
RDY: Green
DP1: -
45 s
1)
Power-up with saved parameters (RAM to ROM was carried out)
The status of the LEDs on the CUD (see also Chapter "Description of the LEDs on the CUD
(Page 635)") can only be seen when the device cover is open.
Note
If options are being used (DCC, CBE20, SMC10, SMC30, TM15, TM31, TM150 etc.) and in
the case of certain device configurations, the duration of the power-up increases.
Note
If an external memory card with previously saved data is plugged into the drive during
power-up, the drive powers up based on the parameter assignments saved on the card
(see also Chapter "Memory card functions (Page 359)").