Figure 8-24 Entering encoder data – Pulse encoder via CUD
⇒
Appropriately set the measuring system (predominantly "incremental HTL/TTL"), the
incremental tracks, the level and the zero marks.
NOTICE
Pulse encoder power supply at terminal X177.41 of the CUD
Terminal X177.41 always pr15 V to supply the incremental encoder. This is
independent of the setting selected under voltage supply.
⇒
Click on OK
⇒
Click on Next >
[3] EMF actual value internal
⇒
Enter the EMF at maximum speed.
(the EMF should be specified as the percentage of the voltage specified in the screen form).
⇒
Click on Next >
[4] Free interconnection via p50609
⇒
Enter the source with the actual value via the BICO interconnection.
⇒