A.2.9
Acceptance test for F-DI status in PROFIsafe telegram 900
7HOHJUDP
6,1$0,&6*'
)&38
9'&
0
;
',
;
/
6B=6:%LW
%LW
6B=6:%LW
%LW
%LW
%LW
;
',
;
',
;
/
;
',
;
0
;
/
6B=6:
Figure A-15 Acceptance test for the status of the fail-safe inputs using the example of a SINAMICS
G120D
Procedure
To perform the acceptance test of the F-DI status, proceed as follows:
Status
-
The inverter is ready
● The inverter signals neither faults nor alarms of the safety functions (r0945[0…7],
r2122[0…7]).
1. Check the "Low" status of the fail-safe input
1.1. Switch the signal of the fail-safe digital input to be tested to "low".
1.2. In the F-CPU, check whether in status word S_ZSW5 the corresponding bit has
the value 0.
2. Check the "High" status of the fail-safe input
2.1. Switch the signal of the fail-safe digital input to be tested to "high".
2.2. In the F-CPU, check whether in status word S_ZSW5 the corresponding bit has
the value 1.
You have completed the acceptance test for the F-DI status.
Appendix
A.2 Examples of acceptance tests
Safety Integrated - SINAMICS G110M, G120, G120C, G120D and SIMATIC ET 200pro FC-2
412
Function Manual, 01/2017, FW V4.7 SP6, A5E34261271B AD