Chapter 1) 7SR242 Duobias Description Of Operation
©2015 Siemens Protection Devices Limited
Chapter 1 Page 35 of 60
3.6 Open Circuit (46BC)
Optionally two open circuit elements are provided, each can be selected to either winding 1 or winding 2.
The element calculates the ratio of NPS to PPS currents. Where the NPS:PPS current ratio is above
46BC
Setting
an output is given after the
46BC Delay
.
The Open Circuit function can be inhibited from
Inhibit 46BC
A binary or virtual input .
Gn 46BC-n U/I Guarded
Operation of the undercurrent guard function.
User Inhibit
Reylogic (graphical logic).
Figure 3-12 Logic Diagram: Open Circuit Function (46BC)
Summary of Contents for 7SR242 Duobias
Page 1: ...Answers for energy 7SR242 Duobias Transformer Protection Relay Reyrolle Protection Devices ...
Page 2: ...2 ...
Page 4: ...4 ...
Page 6: ...6 www siemens com energy ...
Page 318: ... 2015 Siemens Protection Devices Limited Chapter 7 Page 2 of 64 ...
Page 324: ... 2015 Siemens Protection Devices Limited Chapter 7 Page 8 of 64 ...
Page 358: ... 2015 Siemens Protection Devices Limited Chapter 7 Page 42 of 64 ...
Page 366: ... 2015 Siemens Protection Devices Limited Chapter 7 Page 50 of 64 ...
Page 380: ... 2015 Siemens Protection Devices Limited Chapter 7 Page 64 of 64 ...
Page 381: ......