Chapter 6) 7SR242 Duobias Commissioning & Maintenance Guide
©2015 Siemens Protection Devices Limited
Chapter 6 Page 51 of 62
Section 3: Supervision Functions
3.1
CB Fail (50BF)
Figure 3-1 CB Fail
Voltage Inputs:
n/a
Current Inputs:
W1-I
L1
(I
A
), W1-I
L2
(I
B
), W1-I
L3
(I
C
), I
G1
or W2-I
L1
(I
A
), W2-I
L2
(I
B
), W2-I
L3
(I
C
), I
G2
Disable:
Map Pickup LED:
50BF-n-n - Self Reset
The circuit breaker fail protection time delays are initiated either from:
A binary output mapped as
Trip Contact
in the OUTPUT CONFIG>BINARY OUTPUT CONFIG menu,
or
A binary input mapped as
50BF Ext Trip
in the INPUT CONFIG>INPUT MATRIX menu.
Or
A binary input mapped as
50BF Mech Trip
in the INPUT CONFIG>INPUT MATRIX menu.
These elements are operated from W1 and W2 current inputs, ensure that current is injected on the correct input
for the element being tested.
Summary of Contents for 7SR242 Duobias
Page 1: ...Answers for energy 7SR242 Duobias Transformer Protection Relay Reyrolle Protection Devices ...
Page 2: ...2 ...
Page 4: ...4 ...
Page 6: ...6 www siemens com energy ...
Page 318: ... 2015 Siemens Protection Devices Limited Chapter 7 Page 2 of 64 ...
Page 324: ... 2015 Siemens Protection Devices Limited Chapter 7 Page 8 of 64 ...
Page 358: ... 2015 Siemens Protection Devices Limited Chapter 7 Page 42 of 64 ...
Page 366: ... 2015 Siemens Protection Devices Limited Chapter 7 Page 50 of 64 ...
Page 380: ... 2015 Siemens Protection Devices Limited Chapter 7 Page 64 of 64 ...
Page 381: ......