
Chapter 3 Preparations for installation
Mobile DaRt Installation Manual
3-4
After unpacking, turn on the main circuit breaker and key switch (refer to
Fig. 3-1 and Fig. 3-2.), and move the unit to where X-ray radiation is allowed and
power outlet is provided. The main circuit breaker is provided at the front side of
the unit (refer to Chapter 2).
Fig. 3-1
Main circuit breaker
Fig. 3-2
Key switch
ON
OFF
ON
Summary of Contents for 503-61000-01
Page 2: ......
Page 6: ...No Text...
Page 14: ...Chapter 1 Introduction Mobile DaRt Installation Manual 1 8 No Text...
Page 22: ...Chapter 2 Outline Mobile DaRt Installation Manual 2 8 No Text...
Page 110: ...Chapter 6 Specifications Mobile DaRt Installation Manual 6 10 No Text...
Page 136: ...Appendix B Adjustment Mode Mobile DaRt Installation Manual B xxiv No Text...
Page 150: ...Appendix C Adjusting Methods Mobile DaRt Installation Manual C xiv No Text...
Page 154: ...Appendix D Error Message List Mobile DaRt Installation Manual D iv No Text...
Page 208: ...Appendix G Super Maintenance Function Mobile DaRt Installation Manual G iv No Text...