Install the screwjack sleeves on the screwjacks. See Figure 40. Screw the screwjacks all
the way so that they bottom on the end of the universal joints. Be careful to keep the left
and right sides properly identified.
Figure 41
❏
Slip the P/N 520-5 shaft and P/N 520-7 miter gear in place as shown in Figure 41. Align
the hole in the miter gear with the hole in the shaft. Drill through with a 11/64ӯ drill
and then ream with a 3/16ӯ drill. Install the roll pin. (You may find it easier if you
support the shaft with a pair of V-blocks.) Observe the note and warning above for the
installation of taper pins.
Figure 42
❏
You must align the shaft and miter gear so that it runs smoothly with the miter gear on the
vertical shaft. Put the two universal joints (with the screwjacks and screwjack sleeves
Summary of Contents for F.8L Falco
Page 1: ...F 8L Falco Construction Manual...
Page 7: ...l F 8L Falco Construction Manual Revision 4 March 1 2002...
Page 21: ...l F 8L Falco Construction Manual 1 8 Revision 4 March 1 2002...
Page 29: ...l F 8L Falco Construction Manual 2 8 Revision 4 March 1 2002...
Page 43: ...l F 8L Falco Construction Manual 5 4 Revision 4 March 1 2002...
Page 65: ...l F 8L Falco Construction Manual 9 6 Revision 4 March 1 2002...
Page 81: ...l F 8L Falco Construction Manual 10 16 Revision 4 March 1 2002...
Page 109: ...l F 8L Falco Construction Manual 15 4 Revision 4 March 1 2002...
Page 133: ...l F 8L Falco Construction Manual 17 10 Revision 4 March 1 2002...
Page 145: ...l F 8L Falco Construction Manual 18 12 Revision 4 March 1 2002...
Page 173: ...l F 8L Falco Construction Manual 21 10 Revision 4 March 1 2002...
Page 229: ...l F 8L Falco Construction Manual 23 40 Revision 4 March 1 2002...
Page 387: ...l F 8L Falco Construction Manual 28 26 Revision 4 March 1 2002...
Page 393: ...l F 8L Falco Construction Manual A 6 Revision 4 March 1 2002...