l
F.8L Falco Construction Manual
17–7
Revision 4, March 1, 2002
Figure 7
❏
Install both balance weight arms (with spacers) on P/N 750. See Figure 7. Use a 5/32ӯ
drill bit to align the one hole already drilled. You may also use a No. 8 machine screw or
one of the MS20470AD5-16 rivets. If a rivet is used, you will have to ream up the hole
with a No. 21 drill (.159ӯ). Use a clamp to hold these control arms in place.
Figure 8
❏
Clamp the balance weight in place. See Figure 8. Use a 5/32ӯ drill bit to align the rivet
holes. Make sure that the two arms are aligned with each other. Ream up the rivet holes
through the balance weight and arms with a No. 21 drill (.159ӯ). After you have reamed
one of the holes, place a rivet in the hole before drilling the other hole.
❏
You may need to bend the arms slightly to allow for the slight difference in thickness at
each end.
Summary of Contents for F.8L Falco
Page 1: ...F 8L Falco Construction Manual...
Page 7: ...l F 8L Falco Construction Manual Revision 4 March 1 2002...
Page 21: ...l F 8L Falco Construction Manual 1 8 Revision 4 March 1 2002...
Page 29: ...l F 8L Falco Construction Manual 2 8 Revision 4 March 1 2002...
Page 43: ...l F 8L Falco Construction Manual 5 4 Revision 4 March 1 2002...
Page 65: ...l F 8L Falco Construction Manual 9 6 Revision 4 March 1 2002...
Page 81: ...l F 8L Falco Construction Manual 10 16 Revision 4 March 1 2002...
Page 109: ...l F 8L Falco Construction Manual 15 4 Revision 4 March 1 2002...
Page 133: ...l F 8L Falco Construction Manual 17 10 Revision 4 March 1 2002...
Page 145: ...l F 8L Falco Construction Manual 18 12 Revision 4 March 1 2002...
Page 173: ...l F 8L Falco Construction Manual 21 10 Revision 4 March 1 2002...
Page 229: ...l F 8L Falco Construction Manual 23 40 Revision 4 March 1 2002...
Page 387: ...l F 8L Falco Construction Manual 28 26 Revision 4 March 1 2002...
Page 393: ...l F 8L Falco Construction Manual A 6 Revision 4 March 1 2002...