l
F.8L Falco Construction Manual
25–38
Revision 4, March 1, 2002
This brace will be used to screw a clamp for the elevator trim tab cable (which will be
located at B.L. 30).
Fuselage Jig
❏
Make the fuselage jig. See Drawing No. 321. The jig will require some modifications from
the drawing—it should have solid wood internally aft of Sta. 12, and the 50mm notch
should be changed so that the top of the jig aft of Sta. 12 is 50mm below the top of the jig,
since it is not possible to insert the forward fin spar into the notch. In order to be able to
fit the forward fin spar over the jig, it must be sanded to the radiused inside shape of the
spar. Notch the aft end of the jig for the channel-nut and bolt heads for the lower fin
hinges.
Summary of Contents for F.8L Falco
Page 1: ...F 8L Falco Construction Manual...
Page 7: ...l F 8L Falco Construction Manual Revision 4 March 1 2002...
Page 21: ...l F 8L Falco Construction Manual 1 8 Revision 4 March 1 2002...
Page 29: ...l F 8L Falco Construction Manual 2 8 Revision 4 March 1 2002...
Page 43: ...l F 8L Falco Construction Manual 5 4 Revision 4 March 1 2002...
Page 65: ...l F 8L Falco Construction Manual 9 6 Revision 4 March 1 2002...
Page 81: ...l F 8L Falco Construction Manual 10 16 Revision 4 March 1 2002...
Page 109: ...l F 8L Falco Construction Manual 15 4 Revision 4 March 1 2002...
Page 133: ...l F 8L Falco Construction Manual 17 10 Revision 4 March 1 2002...
Page 145: ...l F 8L Falco Construction Manual 18 12 Revision 4 March 1 2002...
Page 173: ...l F 8L Falco Construction Manual 21 10 Revision 4 March 1 2002...
Page 229: ...l F 8L Falco Construction Manual 23 40 Revision 4 March 1 2002...
Page 387: ...l F 8L Falco Construction Manual 28 26 Revision 4 March 1 2002...
Page 393: ...l F 8L Falco Construction Manual A 6 Revision 4 March 1 2002...