l
F.8L Falco Construction Manual
19-4
Revision 4, March 1, 2002
Figure 7
❏
Sand the ribs to the correct angle for the leading edge strip.
❏
Glue the leading edge ribs for Sta. 1 and 6 in place.
❏
Stretch a string across the ribs at Sta. 1 and 6. This is to align the remaining ribs. See
Figure 7.
Figure 8
❏
Fit the remaining ribs. See Figure 8. If you wish, you may fit the Sta. 0 ribs (see Drawing
No. 401), but these ribs are not installed until after the fuselage skin is installed.
Figure 9
❏
Fit the leading edge strip to the ribs and clamp in place. See Figure 9. Check the stabilizer
for alignment. See Drawing No. 402 for the dimensions for the leading edge strip.
Summary of Contents for F.8L Falco
Page 1: ...F 8L Falco Construction Manual...
Page 7: ...l F 8L Falco Construction Manual Revision 4 March 1 2002...
Page 21: ...l F 8L Falco Construction Manual 1 8 Revision 4 March 1 2002...
Page 29: ...l F 8L Falco Construction Manual 2 8 Revision 4 March 1 2002...
Page 43: ...l F 8L Falco Construction Manual 5 4 Revision 4 March 1 2002...
Page 65: ...l F 8L Falco Construction Manual 9 6 Revision 4 March 1 2002...
Page 81: ...l F 8L Falco Construction Manual 10 16 Revision 4 March 1 2002...
Page 109: ...l F 8L Falco Construction Manual 15 4 Revision 4 March 1 2002...
Page 133: ...l F 8L Falco Construction Manual 17 10 Revision 4 March 1 2002...
Page 145: ...l F 8L Falco Construction Manual 18 12 Revision 4 March 1 2002...
Page 173: ...l F 8L Falco Construction Manual 21 10 Revision 4 March 1 2002...
Page 229: ...l F 8L Falco Construction Manual 23 40 Revision 4 March 1 2002...
Page 387: ...l F 8L Falco Construction Manual 28 26 Revision 4 March 1 2002...
Page 393: ...l F 8L Falco Construction Manual A 6 Revision 4 March 1 2002...