Since the holes in P/N 762 are not likely to be exactly the same, you should mark them so
that you can install them in the correct position. One method is to use a center punch
and mark the upper outside of the part.
❏
Drill the two 1/4ӯ holes required for the K1 master relay. The master relay is installed on
the left side of the aircraft at B.L. 360 and the bolt holes are 140mm above W.L. –440. If
you do not have the relay, the holes are 2.44” between centers. This and all other
electrical equipment installed on fuselage frame No. 6 are installed on the aft face of the
frame.
❏
Drill the two 1/4ӯ holes required for the K2 starter relay. The starter relay is installed on
the left side of the aircraft at B.L. 233 and the bolt holes are 18mm above W.L. –440. If
you do not have the relay, the holes are 2.44” between centers.
❏
Drill screw pilot holes for the voltage regulator, install the screws and then remove. The
voltage regulator is installed on the aircraft centerline with the screw holes 200mm above
W.L. –440.
❏
Drill screw pilot holes for the ammeter shunt, install the screws and then remove. The
ammeter shunt is installed on the left side of the aircraft at B.L. 233, centered 68mm
above W.L. –440.
❏
Drill screw pilot holes for the fuse holder for F1, F2 and F7 fuses, install the screws and
then remove. The fuse holder is installed on the left side of the aircraft at B.L. 233,
centered 128mm above W.L. –440.
❏
Drill screw pilot holes for the TB1 terminal block, install the screws and then remove.
The terminal block is installed on the left side of the aircraft at B.L. 233, with its top
234mm above W.L. –440.
❏
If available, install the altitude encoder and then remove for final installation later. The
encoder is installed on the right side of the aircraft at B.L. 233. The Narco AR-850
encoder is installed with four screws with a 2.00” by 2.00” square pattern.
❏
Install an MS21919-DG5 clamp for the elevator trim tab cable. A typical installation is
shown on Drawing No. 117, Detail A. The clamp should be installed in the rectangular
opening for the elevator pushrod with the cable as far to the left side of the aircraft as
possible.
Figure 28
Summary of Contents for F.8L Falco
Page 1: ...F 8L Falco Construction Manual...
Page 7: ...l F 8L Falco Construction Manual Revision 4 March 1 2002...
Page 21: ...l F 8L Falco Construction Manual 1 8 Revision 4 March 1 2002...
Page 29: ...l F 8L Falco Construction Manual 2 8 Revision 4 March 1 2002...
Page 43: ...l F 8L Falco Construction Manual 5 4 Revision 4 March 1 2002...
Page 65: ...l F 8L Falco Construction Manual 9 6 Revision 4 March 1 2002...
Page 81: ...l F 8L Falco Construction Manual 10 16 Revision 4 March 1 2002...
Page 109: ...l F 8L Falco Construction Manual 15 4 Revision 4 March 1 2002...
Page 133: ...l F 8L Falco Construction Manual 17 10 Revision 4 March 1 2002...
Page 145: ...l F 8L Falco Construction Manual 18 12 Revision 4 March 1 2002...
Page 173: ...l F 8L Falco Construction Manual 21 10 Revision 4 March 1 2002...
Page 229: ...l F 8L Falco Construction Manual 23 40 Revision 4 March 1 2002...
Page 387: ...l F 8L Falco Construction Manual 28 26 Revision 4 March 1 2002...
Page 393: ...l F 8L Falco Construction Manual A 6 Revision 4 March 1 2002...