Skin the fuselage between Sta. 1 and the Sta. 2 diagonal frame as shown in Figure 48.
Figure 49
❏
Install the gluing strip on the aft face of the diagonal frame No. 2. This strip is to provide
a gluing surface for the skin that will eventually cover the remaining area back to frame
No. 3. At each side, this strip must be the same width (B.L. position) as the top
lamination of frame No. 3, and then the strip is curved so that it joins the outer skin of the
fuselage. This joining-up occurs approximately at the hanger block for the forward fuel
tank. One view of these gluing strips is on Drawing No. 121. Until the instrument panel
installation is complete, this skin will not be installed.
❏
Install the forward fuel tank access door.
Summary of Contents for F.8L Falco
Page 1: ...F 8L Falco Construction Manual...
Page 7: ...l F 8L Falco Construction Manual Revision 4 March 1 2002...
Page 21: ...l F 8L Falco Construction Manual 1 8 Revision 4 March 1 2002...
Page 29: ...l F 8L Falco Construction Manual 2 8 Revision 4 March 1 2002...
Page 43: ...l F 8L Falco Construction Manual 5 4 Revision 4 March 1 2002...
Page 65: ...l F 8L Falco Construction Manual 9 6 Revision 4 March 1 2002...
Page 81: ...l F 8L Falco Construction Manual 10 16 Revision 4 March 1 2002...
Page 109: ...l F 8L Falco Construction Manual 15 4 Revision 4 March 1 2002...
Page 133: ...l F 8L Falco Construction Manual 17 10 Revision 4 March 1 2002...
Page 145: ...l F 8L Falco Construction Manual 18 12 Revision 4 March 1 2002...
Page 173: ...l F 8L Falco Construction Manual 21 10 Revision 4 March 1 2002...
Page 229: ...l F 8L Falco Construction Manual 23 40 Revision 4 March 1 2002...
Page 387: ...l F 8L Falco Construction Manual 28 26 Revision 4 March 1 2002...
Page 393: ...l F 8L Falco Construction Manual A 6 Revision 4 March 1 2002...