F.8L Falco Construction Manual
17–6
Revision 4, March 1, 2002
Figure 5
❏
Drill P/N 750 with a 5/32ӯ drill at 37mm below the hinge line. See Figure 5. Drill only
one hole at this time. Insure that this hole is 14mm from the base of the hinge (see
Drawing No. 750). The holes for the attachment of the arm should be parallel to the base
of the hinge and in line with the lower control cable hole.
Figure 6
❏
Place one P/N 825A arm on the elevator balance weight and drill the two 5/32ӯ holes
through the balance weight. See Figure 6.
Note:
In the following steps, you will be installing the balance weight arms on the balance
weight. A few builders have reported that they found this operation difficult since the
lead weight is so soft. For this reason, you might want to install the weight with AN525-
832R16 screws and MS21042-08 nuts. If so, the holes for the screws should be reamed
with a No. 19 drill (.166ӯ).
Summary of Contents for F.8L Falco
Page 1: ...F 8L Falco Construction Manual...
Page 7: ...l F 8L Falco Construction Manual Revision 4 March 1 2002...
Page 21: ...l F 8L Falco Construction Manual 1 8 Revision 4 March 1 2002...
Page 29: ...l F 8L Falco Construction Manual 2 8 Revision 4 March 1 2002...
Page 43: ...l F 8L Falco Construction Manual 5 4 Revision 4 March 1 2002...
Page 65: ...l F 8L Falco Construction Manual 9 6 Revision 4 March 1 2002...
Page 81: ...l F 8L Falco Construction Manual 10 16 Revision 4 March 1 2002...
Page 109: ...l F 8L Falco Construction Manual 15 4 Revision 4 March 1 2002...
Page 133: ...l F 8L Falco Construction Manual 17 10 Revision 4 March 1 2002...
Page 145: ...l F 8L Falco Construction Manual 18 12 Revision 4 March 1 2002...
Page 173: ...l F 8L Falco Construction Manual 21 10 Revision 4 March 1 2002...
Page 229: ...l F 8L Falco Construction Manual 23 40 Revision 4 March 1 2002...
Page 387: ...l F 8L Falco Construction Manual 28 26 Revision 4 March 1 2002...
Page 393: ...l F 8L Falco Construction Manual A 6 Revision 4 March 1 2002...