![SENSTAR Symphony 7.2 Series User Manual Download Page 119](http://html.mh-extra.com/html/senstar/symphony-7-2-series/symphony-7-2-series_user-manual_1244253119.webp)
Symphony Client
13. In the
Graph
section, perform the following tasks to determine the appearance of the graph in
the report:
a) In the
Default Graph
list, select the alarm type to display.
b) In the
Graph Type
list, select whether the graph is a line or bar graph.
c) In the
Graph Size
list, select the size of the graph.
14. In the
Table Layout
section, perform the following tasks to determine the appearance of the
table in the report:
a) In the
Columns
list, select the information that will appear in the columns of the report.
b) In the
Grouping
section, select how the information is grouped in the report.
c) In the
Sorting
section, select how the information is sorted in the report.
15. Click
Save
.
Create an object statistics report
The object statistics report displays information about objects traffic and dwell time for a specific
time.
1.
In the client interface, click
Reports
.
The Report Designer opens in a browser.
2.
Log in to the Report Designer.
3.
Click
New Report
.
4.
Type a name for the report.
5.
In the
Report Type
list, select
Object Statistics
.
6.
To allow other users to run the report, select
Allow other users to run this report
.
7.
Click
OK
.
8.
In the
Cameras
section, perform the following tasks to add the cameras that provide
information for the report:
a) Click
Add Cameras
.
b) Select one or more cameras.
You can search for cameras by camera name.
c) Click
OK
.
9.
In the
Date Range
section, perform the following tasks to determine the data that the report
includes:
a) In the
Start including data from
section, define the start of the data.
b) In the
Stop including data after
section, define the end of the data.
c) To use data from a specific time range from each day, select
Use custom time range for
data collection
and specify the time range.
10. In the
Schedule
section, perform the following tasks to determine when the report runs and
what information is contains:
a) Select whether to run the report manually or on a schedule.
b) If you select to run the report on a schedule, set the schedule.
c) Specify the time from which to collect data for the report.
You can set a relative time based on the report or select specific times.
d) Select how to group the data.
11. In the
Distribution
section, perform the following tasks to determine how Symphony
distributes reports:
a) To send the report attached to an email, select
Send report in email
, specify the email
addresses of the recipients, and select the file formats for the reports.
b) To save the report as a file, specify the path, define the file name, and select the file
formats.
Senstar Symphony User Guide
119