55
Image
Action step
The first charge starts with a duration of 10
minutes.
The following values are expected for „ Actual
current “:
SENEC.Home Li 2.5: 20 - 24 A
SENEC.Home Li 5.0: 30 - 36 A
SENEC.Home Li 7.5: 40 - 48 A
SENEC.Home Li 10.0: 45 - 65 A
The discharge test is run at half power.
The following values are expected for „ Actual
current “:
SENEC.Home Li 2.5: 20 - 24 A
SENEC.Home Li 5.0: 30 - 36 A
SENEC.Home Li 7.5: 40 - 48 A
SENEC.Home Li 10.0: 45 - 65 A