51
Image
Action step
20. Now configure SENEC.Heat. To do this, select
the number of power control units fitted (up to
6 units are possible).
21. Select the priority for excess energy.
22. Enter the Model(s) of the power control unit,
depending on the number of power control
units fitted.
23. Optionally, enter the total power (automatically
distributed over three phases) or the power for
the individual phases.
24. Select the minimum temperature that should
be maintained under any circumstances.
25. Select the maximum temperature that must not
be exceeded.
26. Select the cylinder capacity.
27. Select the bus address of the power con-
trol unit (consult power control unit manual).
The power consumption can be determined
precisely in the case of the Solar Invert SHKW
by using a power flow direction sensor with the
bus address 100 (for the first unit), 101 (for the
second unit), etc.
28. Confirm your entries by clicking on “Next”.