612
The thunder proof ground shall adopt the special ground cable from the monitor
control room to the ground object. The ground cable adopts copper insulation cable
or wire and its ground section shall be more than 20mm2.
The ground cable of the monitor system can not short circuit or mixed connected with
the strong alternative current cable.
For all the ground cables from the control room to the monitor system or ground cable
of other monitor devices, please use the copper resistance soft cable and its section
shall be more than 4mm2.
The monitor system usually can adopt the one-point ground.
Please connect the ground end of 3-pin socket in the monitor system to the ground
port of the system (protection ground cable)
4. The shortcut way to check the electric system using the digital multimeter
For 220V AC socket, from the top to the bottom, E (ground cable), N (neutral cable), L(live
cable). Please refer to the following figure.
There is a shortcut way to check these thee cables connection are standard or not (not the
accurate check).
Importance
In the following operations, the multimeter range shall be at 750V!
For E (earth cable)
Turn the digital multimeter to 750V AC, use your one hand to hold the metal end, and then
the other hand insert the pen to the E port of the socket. See the following figure. If the
multimeter shows 0, then you can see current earth cable connection is standard. If the
value is more than 10, then you can see there is inductive current and the earth cable
connection is not proper.
Summary of Contents for PENDVR-EL16M4K
Page 1: ...PENDVR EL16M4K ELITE SERIES...
Page 20: ...247 2 3 Connection Sample...
Page 128: ...363 restore original status Figure 4 115 Figure 4 116 4 9 1 3 1Upgrade Camera...
Page 151: ...386 Figure 4 137 Figure 4 138...
Page 166: ...401 Figure 4 153 Step 2 Draw the zone 1 Click Draw button to draw a zone See Figure 4 154...
Page 172: ...407 Figure 4 157 Figure 4 158...
Page 173: ...408 Figure 4 159 Figure 4 160...
Page 174: ...409 Figure 4 161 Figure 4 162...
Page 177: ...412 Figure 4 165 Figure 4 166...
Page 178: ...413 Figure 4 167 Figure 4 168...
Page 184: ...419 Figure 4 177 Figure 4 178 4 9 4 1 2 2 Trigger Snapshot...
Page 186: ...421 Figure 4 180 Figure 4 181 4 9 4 1 2 3 Priority...
Page 192: ...427 Figure 4 186 Figure 4 187...
Page 197: ...432 Figure 4 193 Figure 4 194...
Page 283: ...518 Figure 5 69 Figure 5 70...
Page 299: ...534 device Figure 5 86 Figure 5 87...
Page 305: ...540 Figure 5 94 Figure 5 95...
Page 306: ...541 Figure 5 96 Figure 5 97 Please refer to the following sheet for detailed information...
Page 333: ...568 Figure 5 136 Note For admin you can change the email information See Figure 5 137...