GENERAL RULE
S
PAGE
5
8
700+
smgr.fm
S
AF
ETY M
AN
U
AL
15.18
Remember to mount and dismount the unit using the “3-Point
Rule.” One hand and two feet or two hands and one foot are to be in contact with
a secure surface at all times (Figure 73).
15.19
Inspect the repairs.
After modifications to structural members
(boom, outriggers, tower, etc.) the repair must be inspected by qualified personnel
before use.
15.20
Always use the correct tools for the job.
Tools should be kept
clean and in good condition.
15.21
If you see a coworker engaging in an unsafe practice, warn him
about the dangers. Safety is always in the hands of those on the job!
15.22
After any repair is completed, test the function of the repaired
part to be sure the repairs were done correctly.
WARNING
safestep.eps
Figure 73
The 3-Point Rule
WARNING
WARNING
WARNING
WARNING
Summary of Contents for SPB 28
Page 2: ......
Page 4: ......
Page 8: ...8 Table of Contents SPB Operation Manual...
Page 10: ......
Page 16: ...16 Introduction SPB Operation Manual...
Page 18: ......
Page 22: ...22 Specifications SPB Operation Manual SPB 35 Working Range Diagram SPB 35 235...
Page 24: ...24 Specifications SPB Operation Manual Working Range Diagram SPB 37 SPB 37 235...
Page 26: ......
Page 28: ...28 Safety S 39 41 SX Operation Manual...
Page 113: ...402indexcov eps ALPHABETICAL INDEX 700indxcov fm PAGE 83 SAFETY MANUAL Alphabetical Index...
Page 122: ...30 Overview S 39 41 SX Operation Manual...
Page 154: ...62 Operation SPB Operation Manual Lifting Instructions 1 of 3...
Page 155: ...63 Operation SPB Operation Manual Lifting Instructions 2 of 3...
Page 156: ...64 Operation SPB Operation Manual Lifting Instructions 3 of 3...
Page 200: ......
Page 216: ...124 Appendix SPB Operation Manual...