51
Operation
SPB Operation Manual
Lower Assembly
tied to reinforcement rods
before the slab is poured
(Non-reusable)
Upper Assembly
(Reusable)
Concrete Slab
Anchor Rods
Figure 8
Cross frame alignment template
Cross Frame Installation
1. When the concrete has cured, you can mount the
cross frame to the slab.
2. The area around the slab must be cleared and lev-
el before the cross frame can be lifted into position.
3. Pick the cross frame using the proper lifting points.
4. Place the cross frame into position on the slab.
5. Check with levelling instrument to ensure that the
frame is level. Use steel shims or packers to level
the cross frame.
6. Once the cross frame is centered and levelled the
lifting gear is removed.
7. Secure the frame in place using 4 each 1-3/4”
plates (supplied with cross frame) and with 8 each
1-1/2” double nuts and washers.
Lifting points
Threaded rods
in slab
Figure 9
Cross frame lifted into position
8. The 1-1/2” nuts should be tightened to approxi-
mately 1300 foot/pounds of torque.
9. The cross frame is now ready to receive the plat-
form assembly and seperate placing boom. For
placing boom lifting instructions, see “Lifting In-
structions (1 of 3)” on page 62.
For specific information regarding bolt specifica
-
tions refer to Schwing drawing number 30502676
and 30502677.
Summary of Contents for SPB 28
Page 2: ......
Page 4: ......
Page 8: ...8 Table of Contents SPB Operation Manual...
Page 10: ......
Page 16: ...16 Introduction SPB Operation Manual...
Page 18: ......
Page 22: ...22 Specifications SPB Operation Manual SPB 35 Working Range Diagram SPB 35 235...
Page 24: ...24 Specifications SPB Operation Manual Working Range Diagram SPB 37 SPB 37 235...
Page 26: ......
Page 28: ...28 Safety S 39 41 SX Operation Manual...
Page 113: ...402indexcov eps ALPHABETICAL INDEX 700indxcov fm PAGE 83 SAFETY MANUAL Alphabetical Index...
Page 122: ...30 Overview S 39 41 SX Operation Manual...
Page 154: ...62 Operation SPB Operation Manual Lifting Instructions 1 of 3...
Page 155: ...63 Operation SPB Operation Manual Lifting Instructions 2 of 3...
Page 156: ...64 Operation SPB Operation Manual Lifting Instructions 3 of 3...
Page 200: ......
Page 216: ...124 Appendix SPB Operation Manual...